DOT Announces Major Route 15 Sign Replacement Project

By Emma Whitney

The Connecticut Department of Transportation (CTDOT) is embarking on a significant infrastructure upgrade with a comprehensive sign support replacement project on Route 15 which began on September 9 and will continue until July 11, 2026. The project will span several towns including New Canaan, Greenwich, Stamford, Milford, Orange, Woodbridge, New Haven, Hamden, North Haven, Wallingford, and Meriden.

This extensive initiative, designated CTDOT Project No. 0083-0271, involves replacing outdated extruded aluminum signs and supports that no longer meet the current Manual on Uniform Traffic Control Devices (MUTCD) standards. The existing signage has shown signs of wear, inadequate retro-reflectivity, and structural deficiencies due to the increased size requirements for modern signage and current wind loading criteria. 

The project also includes updating exit numbers from sequential to mileage-based numbering, in line with Federal regulations. Two new permanent variable message signs will be installed to integrate with the CTDOT’s Advanced Traffic Management System (ATMS) for Limited Access Highways.

Awarded to Ducci Electrical Contractors at a cost of $7.48 million, this project is being administered by the Bureau of Engineering and Construction, Office of Construction, District 3 in New Haven.

Motorists should anticipate various traffic adjustments during the project. Work on Route 15 will occur during the following times:

CT-15 Northbound in Greenwich Exit 28 Off-Ramp: 6AM– 6AM Monday–Tuesday; 6AM– 3AM Wednesday – Friday; 7AM – 3AM Saturday; 5AM – 6AM Sunday

CT-15 Southbound in Greenwich Exit 28 On-Ramp: 6AM – 3AM Monday –Wednesday; 6AM – 4AM Thursday–Friday; 4AM – 4AM Saturday; 5AM – 3AM Sunday

CT-15 Northbound in Stamford to Exit 35 On-Ramp: 8AM – 6AM Monday–Tuesday; 8AM – 3AM Wednesday; 6AM – 3AM Thursday – Saturday; 5AM – 6AM Sunday

CT-15 Southbound in Stamford Exit 35 On-Ramp: 6AM – 4AM Monday–Thursday; 6AM – 6AM Friday; 5AM – 6AM Saturday; 5AM – 4AM Sunday

CT-15 Northbound on the Stamford-Norwalk border Exit 35 On-Ramp to Exit 39B Off-Ramp: 6AM – 6AM (Monday–Wednesday); 6AM – 2AM Thursday – Saturday; 5AM – 6AM Sunday

CT-15 Southbound (Norwalk-Stamford) Exit 39B On-Ramp to Exit 35 On-Ramp: 7AM – 5AM Monday–Thursday; 7AM – 6AM Friday; 7AM – 8AM Saturday; 7AM – 5AM Sunday

CT-15 Northbound on the Stamford-Norwalk border Exit 39B Off-Ramp to Exit 41 Off-Ramp: 8AM – 6AM Monday–Sunday

Work on limited-access highway ramps and secondary roads will be scheduled to minimize disruption. Motorists are advised to adjust their travel plans accordingly, adhere to posted speed limits, and remain alert to changes in traffic conditions.

This upgrade is a crucial step towards ensuring safer and more efficient travel along Route 15, aligning with contemporary traffic management standards and enhancing overall road safety for Connecticut’s commuters.

Related Posts
Loading...